On the 15th of March, the Gran Canaria Arena, a multipurpose hall with a maximum capacity for 10,000 spectators, built through a temporary joint venture lead by COMSA, opened in Las Palmas de Gran Canaria. The project cost 70 million Euros and took place over 23 months. The Gran Canaria Arena has first class...